Karabiga Power Plant

Karabiga Power Plant

CENAL Elektrik Üretim A.Ş.

|

Turkey

|

2013–Ongoing

1,350,000 t of COemissions reduced compared to a subcritical boiler.

610°C steam temperatures.

280 bar steam pressure.

Strict EU emission standards.

Challenges

  • The design of the new power plant needed to accommodate a diverse range of coal from various sources around the world.
  • It was critical that the project design aligned with local Turkish and international standards with stringent European Union emission standards.
  • The project is being designed by a Chinese Design Institute and constructed by local Turkish companies.
  • Global sourcing of equipment was needed to optimize the CAPEX.

Solutions

  • Involved as owner’s engineer since the initial development phase to oversee design of this new ultra-supercritical coal-fired power plant on the coast of the Marmara Sea.
  • The project team includes thermal power engineers to oversee the design who are familiar with Chinese design practices for coal-fired power plants and who understand Chinese standards (GB code) to bridge any gaps to applicable international standards.
  • Participated in the technical bid evaluation for the major equipment of the plant to select the best technology that met the technical requirements and achieved the best life-cycle costs for the client.
  • Deployed specialist team for environmental technologies to the project to assess various technology offerings to comply with the strict EU emission standards in an economical manner.

Highlights

  • The ultra-supercritical steam generation process operates above supercritical pressures and at advanced steam temperatures to improve plant efficiency compared to conventional coal-fired power stations, thereby reducing feedstock costs and carbon emissions.
  • Implemented state-of-the art emission control technologies to meet strict EU emission standards.
  • The plant utilizes the coastal location for seawater cooling.

Project numbers

1,320 MW of power generation
Up to 45% efficiency (LHV basis)
600,000 tons of coal saved each year by using ultra-supercritical boilers
2 x 660 MW ultra-supercritical coal-fired power plant

Services & technologies provided

Corrosion

Engineering

Procurement

Project management