Phoenix Mill Expansion
Newmont Mining Corporation | United States | 2011–2012
33,700 to 48,000 tpd
increase in throughput
2x
rougher flotation retention time
Increased
capacity in the existing grinding cyclones
Increased
capacity in the existing deslime cyclones
Challenges
- The mill struggled with ore variability and hardness, producing a copper concentrate with gold and silver credits that decreased throughput, and ultimately reduced metal and concentrate production.
- One of the main challenges of this brownfield operation was installing the circuits within existing process infrastructures without disturbing ongoing operations.
- Integrating the new circuits required a lot of planning to ensure the scheduled shutdown and process commissioning was kept to a minimum.
Solutions
- Provided detailed engineering, procurement assistance, and field support for the project.
- A two-phased expansion of the mill facilitated the increased throughput.
- Phase 1 added a new secondary crushing and screening circuit to decrease feed particle size to the SAG mill.
- Phase 2 expanded the grinding, rougher flotation, and tailings deslime areas, increasing capacity in the existing grinding cyclones and the deslime cyclones, and doubling the rougher flotation retention time.
Highlights
- Increased overall mill throughput from 33,700 to 48,000 tons per day
- Increased capacity in the existing grinding cyclones
- Doubled the rougher flotation retention time and increased the capacity in the existing deslime cyclones
Project numbers
US$8.5 million33,700 to 48,000 tpd increase in overall mill throughput
What's your challenge?
Related projects
![Li-Cycle-Rochester-Hub_th](/-/media/Hatch-Corporate/Projects/MetalsMinerals/Li-Cycle-Rochester-Hub_th.jpg?h=175&iar=0&w=265&hash=C1547DE96415E76946C58AB600373C05)
Li-Cycle Rochester Hub
Rochester, New York, USA
![Voisey's Bay Mine Site, courtesy of Vale Canada Limited.](/-/media/Hatch-Corporate/Projects/MetalsMinerals/Hatch-Vale-thumb.jpg?h=175&iar=0&w=265&hash=2B1FBDC7A04F0B83C8E7269482071E59)
Voisey's Bay Mine Expansion
Canada
![Resolution Copper Mine — No. 9 Shaft Deepening Project](/-/media/Hatch-Corporate/Projects/MetalsMinerals/Resolution_Mine_Headframe_Approved-thumb.jpg?h=175&iar=0&w=265&hash=1EE986883595938D58C4103C8F14DE33)
Resolution Copper Mine — No. 9 Shaft Deepening Project
Arizona, United States
![copper](/-/media/Hatch-Corporate/Banner/Copper_2_Thumb.jpg?h=175&iar=0&w=265&hash=ECA112881BBC4A8375DD188E634F237D)
Tenke Fungurume Mine
Democratic Republic of Congo
![Mina Ministro Hales](/-/media/Hatch-Corporate/Projects/MetalsMinerals/Ministro_Halesthumb.jpg?h=175&iar=0&w=265&hash=46D0A7D285EF4F75A40A5699B405DF7A)
Mina Ministro Hales
Chile
![Kamoto Refinery and Roaster Refurbishment](/-/media/Hatch-Corporate/Projects/Services-and-Technologies/Kamoto_Thumb.jpg?h=175&iar=0&w=265&hash=82C0CC7132FE3066B2E7C2E5A6586941)
Kamoto Refinery & Roaster Refurbishment
Democratic Republic of Congo