![](/-/media/Hatch-Corporate/Projects/MetalsMinerals/Ministro_Halesv2-filter.jpg)
Mina Ministro Hales
Vicepresidencia Corporativa de Proyectos (Codelco) | Chile | 2010–2014
550,000 tpa
copper concentrate bearing 6% arsenic
444,000 tpa
copper calcine bearing 0.3% arsenic
183,000 tpa
increase in output
1,300 Mt
(0.96% Cu) of resources
Challenges
- Develop a 50,000 tpd copper concentrator while concurrently executing various large projects with limited qualified workforce availability.
- Provide solutions and coordinate interfaces between the new facilities and existing installations.
- Sustain the implementation schedule and budget.
- The plant's location, next to the city of Calama, was also a challenge.
Solutions
- Developed the basic and detailed engineering, procurement, and site-support services for the greenfield conventional copper concentrator, the roaster peripheral facilities, and the plant-wide infrastructure.
- Codelco representatives worked in close collaboration with our team, reviewing the incorporation of design features to provide high plant-availability and operations-workforce productivity.
- Technical optimization of the exisiting concentrator plant resulted in improved availability and utilization.
- Controlled mining and abatement systems for crushing and ore-handling facilities reduced dust emissions affecting the nearby Calama population.
Highlights
- We were awarded the sole-source contract given our strong implementation-phase team and previous successful delivery during basic engineering.
- Technical optimization of the concentrator plant has resulted in improved availability and utilization.
- The controlled mining-and-abatement systems for crushing and ore-handling facilities reduced dust emissions affecting the Calama population.
- Concentrator facility was delivered by Codelco on time and had a rapid start-up to full capacity.
”With this new operation we transition to more efficient and productive mining. Ministro Hales is our most productive asset, delivering 67 t of refined copper by person this first year of operation, 70% over the corporative value.”
Project numbers
300 tpa of silver1,300 Mt (0.96% Cu) of resources
289 Mt of reserves processed
164 tpa of calcine storage and truck loading facility
US$3.1 billion overall project CAPEX
41 month project implementation schedule
What's your challenge?
Related projects
![Li-Cycle-Rochester-Hub_th](/-/media/Hatch-Corporate/Projects/MetalsMinerals/Li-Cycle-Rochester-Hub_th.jpg?h=175&iar=0&w=265&hash=C1547DE96415E76946C58AB600373C05)
Li-Cycle Rochester Hub
Rochester, New York, USA
![Voisey's Bay Mine Site, courtesy of Vale Canada Limited.](/-/media/Hatch-Corporate/Projects/MetalsMinerals/Hatch-Vale-thumb.jpg?h=175&iar=0&w=265&hash=2B1FBDC7A04F0B83C8E7269482071E59)
Voisey's Bay Mine Expansion
Canada
![Resolution Copper Mine — No. 9 Shaft Deepening Project](/-/media/Hatch-Corporate/Projects/MetalsMinerals/Resolution_Mine_Headframe_Approved-thumb.jpg?h=175&iar=0&w=265&hash=1EE986883595938D58C4103C8F14DE33)
Resolution Copper Mine — No. 9 Shaft Deepening Project
Arizona, United States
![copper](/-/media/Hatch-Corporate/Banner/Copper_2_Thumb.jpg?h=175&iar=0&w=265&hash=ECA112881BBC4A8375DD188E634F237D)
Tenke Fungurume Mine
Democratic Republic of Congo
![Copper wire](/-/media/Hatch-Corporate/Banner/Copper_wire_Thumb.jpg?h=175&iar=0&w=265&hash=61F4792C5B7A1B64F9DB518908C6A816)
Phoenix Mill Expansion
United States
![Kamoto Refinery and Roaster Refurbishment](/-/media/Hatch-Corporate/Projects/Services-and-Technologies/Kamoto_Thumb.jpg?h=175&iar=0&w=265&hash=82C0CC7132FE3066B2E7C2E5A6586941)
Kamoto Refinery & Roaster Refurbishment
Democratic Republic of Congo