King Transnet Freight Railway Mainline Deviation Project
Assmang Limited | South Africa | 2011–2014
864,758 LTI-free
manhours worked
Construction completed
in time for maintenance shutdown
8.36 km
of electrified railway line constructed
Challenge
- Expand the Khumani Iron Ore Mine, located 18 km south of the town of Kathu in the Northern Cape, on the Bruce, King, Mookaneng, and Parson farms
- Deviate the Postmasburg and Hotazel Transnet Freight Rail line in order to develop the King ore body and sustain the increased annual throughput
- Construct approximately 8.36 kilometers of electrified railway line and associated infrastructure including stormwater diversion
- Uplift and stack the existing perway and overhead traction equipment material
Solution
- Provided EPCM services for the implementation phase of the project
- Reviewed and confirmed the engineering and design deliverables undertaken as part of the Khumani Expansion project
- Undertook the procurement function required for and on behalf of Assmang Limited for the placement of supply contracts and construction packages
- Provided quality assurance and control of the supply and construction packages
Highlights
- Installation of perway
- Overhead traction equipment approved, with quality exceeding Transnet Freight Rail's expectation
- Project within budget
What's your challenge?
Related projects

Three Chain Road project
Australia

The socioeconomic impact of the Gautrain study
South Africa

Sound Transit Advisory
United States

Bandar Malaysia
Malaysia

TraPac Terminal Automation Support
United States

Calgary Green Line LRT
Canada

Regional Connector Transit Corridor
United States

Centennial Parkway
Canada

Edmonton Valley Line LRT
Canada

Silicon Valley Rapid Transit Project/BART
United States

Transnet Capital Expansion Program
South Africa