Downtown Redmond Link Extension
2 Line extension adds 3.4 miles of double track, two new stations and a parking garage into Downtown Redmond
Sound Transit
|
Seattle, Washington, USA
|
2018-2025
3.4 miles of
new light rail
Two new stations:
Marymoor Village and Downtown Redmond
1,400 parking spaces at
Marymoor Village Station
Delivered on time
and on budget
Challenges
- Establish new 2 Line service from Redmond Technology Station to downtown Redmond.
- Add two new stations in southeast Redmond and downtown Redmond.
- Provide convenient connections to the regional transit network from east King County.
- Improve access to Marymoor Park, downtown Redmond, and regional destinations.
Solutions
- Enabled seamless system expansion by designing traction power, overhead catenary, signaling, and communications fully integrated into Sound Transit’s 2 Line network.
- Brought critical infrastructure together through coordinated systems design, supporting reliable and efficient operations across the new extension and stations.
- Helped meet rising demand by supporting procurement of 62 low-floor light rail vehicles and an additional 152 cars for future growth.
- Worked side-by-side with Sound Transit and King County Metro to align operations, maintenance, and engineering for long-term performance and service reliability.
Highlights
- Seamless integration for the tie into the existing and operating East Link Extension
- Project remained on schedule and within the $1.5 billion budget.
- 46 miles of light rail across three counties.
- Service every 10 minutes from 5:30 a.m. to 9:30 p.m.
- Additional parking spaces at Marymoor Village improves multimodal access.
Project Numbers
- Extension Length: 3.4 miles
- New Stations: 2
- Parking Spaces (Marymoor Village): 1,400
- Train Frequency: Every 10 minutes