Skip Links
Burnhamthorpe Water Project

Burnhamthorpe Water Project

Making way for dramatic urban transformation

Region of Peel | Canada | 2016 - Ongoing

Project numbers

  • Approximately C$160 million project construction cost
  • Water and sanitary infrastructure with total length of over 12 kilometres
  • 1,700 metres of 600-mm watermain constructed by open-cut trenching and trenchless methods along Burnhamthorpe Road
  • 800 metres of 750-mm watermain constructed by open-cut trenching and trenchless methods along Hurontario Street
  • 1,500 metres of 1,200-mm diameter sanitary sewer constructed by microtunneling on Duke of York Boulevard and Burnhamthorpe Road
  • 3,700 metres of 1,500-mm watermain constructed by tunneling on Burnhamthorpe Road
Please assign a data source for this component.
Please assign a data source for this component.